Summary
This article shows how to create, edit and delete a production plan line.
How to create a new production plan line
Follow these steps to create a new line:
- From the pull-drawers of Bravo click on “Manufacturing”
- Select the option "Production plans"
- Double click on the production plan
- Click on "Edit"
- Click on "+"
- Insert the bill of material code
- Insert the quantity
- Insert the delivery date
- Insert the job code
- Insert the notes
- Click on "Save"
- Click on "Save"
How to edit a production plan line
Follow the steps below to edit a production plan line:
- From the pull-drawers of Bravo click on “Manufacturing”
- Select the option "Production plans"
- Double click on the production plan
- Click on "Edit"
- Click on the line
- Click on "Edit" (pencil)
- Make necessary changes
- Click on "Save"
- Click on "Save"
NOTE: There is the possibility to edit a production plan line only before the creation of manufacturing orders.
How to delete a production plan line
Follow the following steps to delete a production plan line:
- From the pull-drawers of Bravo click on “Manufacturing”
- Select the option "Production plans"
- Double click on the production plan
- Click on "Edit"
- Click on the line
- Click on "X"
- Click on "Yes" in the message box
- Click on "Save"
Comments